Escape Light for CMT

The first 329 pieces of the ROBUST CMT tunnel escape lighting armature is on its way and ready to be installed in the Copenhagen Metro Tunnel.

The second part of the Copenhagen Metro Tunnel is expected to open in the Summer of 2019 and will, like the first part of the tunnel, be fitted with escape lights designed and produced by SafeExit A/S. A total of 1798 escape lights will be installed throughout the entire tunnel.